Closed Change Unbilled Cost Finder
Check your closed change register and cost ledger for missing supporting records.
Construction change orders
Recheck the figures in your approved changes and payment applications against the rules you supply.
A downloadable skill for your AI agent.
Inconsistent retention amounts.
Source references, missing information, and questions to review stay with the findings.
Open your download and follow the start guide. Use an AI agent that can load skill files and run the included tools.
Approved changes and payment applications. Confirm the case and period you want to check.
Copy the request below into your agent. Add the files and any task details it needs.
Check the findings against the original records. Choose where to save the report and follow up on open questions.
Use the Change Order Retention Mismatch Check skill. Review the attached records: approved changes and payment applications. Prepare this result: inconsistent retention amounts. Include a source reference for each finding. List missing information and questions that need my review. Ask me to confirm the scope and where to save the report before you start.
It records the rule and the values used in each calculation. It works out the expected amount and compares it with the reported amount.
Approved changes and payment applications.
For this task, keep one review row for each approved change + payment period. Record retention base, rate, release rule, and withheld amount. Keep the source location beside each value.
Keep original scope, extra work, instruction authority, quantities, and charge periods distinct. A site instruction is not an approval to pay. Link each extra-work item to its contract or drawing reference.
Check labor ticket dates, material credits, markup order, retention basis, and currency before comparing totals.
The helper validates arithmetic, not the legal or business rule. It does not infer a formula, evaluate spreadsheet functions, or round silently. Use a sourced tolerance for rounding comparisons.
This synthetic example shows the included check in use. Your agent uses its findings to complete your task report.
Synthetic example records
| Sample record | expression: quantity * rate; variables: quantity: 4; rate: 25.00; observed: 101.00; unit: example units |
|---|
A difference needs review
This result comes from the checking tool in your download.
These are synthetic records from the bundled example.
Synthetic rule: amount = quantity * rate; no tolerance. Not customer evidence.{"expression": "quantity * rate", "id": "r1", "key": "approved change + payment period / SYNTHETIC-001", "observed": "101.00", "rule_source_id": "rule", "unit": "synthetic-unit", "variables": {"quantity": "4", "rate": "25.00"}}After purchase, extract the ZIP. Run these commands from the skill folder. Use a new output folder.
python3 scripts/checks.py
python3 scripts/audit.py assets/example.json \
--files-root assets/sample-files --output-dir example-result
Expected exit code: 1. Code 0 means no helper finding. Code 1 means a finding or review item. Code 2 means incomplete or invalid input.
The check uses the records you supply. Review each finding against the original documents.
Ask your agent to save the completed task report in a folder you choose. The report template includes the result, source references, missing information, and next actions.
Tonotes does not receive your work documents through this website. Documents you share with an AI service follow that service's storage settings.
US$11 includes one skill in a ZIP with 18 files. You receive the instructions and tools to run the task with your own records.
Use an agent that supports SKILL.md instructions and Python 3.10 or later with SQLite. Your AI-agent service is separate.
Start with approved changes and payment applications. Confirm the case, period, and source versions before the review.
Use project, change ID, trade, instruction revision to keep records distinct. The agent records the original value, an exact quote, and the source location.
Apply the supplied formula and compare the calculated amount with the reported amount. Run the Python helper on the structured records. Check each finding against its source.
Prepare the task result: inconsistent retention amounts. Include missing evidence, unresolved questions, and the next action for each open item.
Eight synthetic cases check the tool locally. Live-agent accuracy on real documents has not been tested.